Overal projects
№ |
Client\Customer |
Agreement Subject |
Agreement Year |
0 |
Helios LLP |
External power supply project, geodetic works, gas\fuel station |
2009 |
1 |
KazNefteProject LLP |
Working design. Overhaul of foam fire extinguishing networks |
2010 |
2 |
KazNefteProject LLP |
Working design. Reconstruction of the oil level measurement system. NPC Zhetybai |
2010 |
3 |
Caspiy Engineering LLP |
Working project "Psychoneurological clinic for 80 beds", Atyrau |
2010 |
4 |
Caspiy Engineering LLP |
Kindergarten, Dossor village. Working project "Kindergarten for 100 places of sanatorium type for contact children" |
2010 |
5 |
Caspiy Engineering LLP |
Regional Children's Hospital in Atyrau. Section of the working project: power supply and electric lighting |
2010 |
6 |
Caspiy Engineering LLP |
Kindergarten for 160 children, Akzhar village. Section of the working project: power supply and electric lighting |
2010 |
7 |
Caspiy Engineering LLP |
Kindergarten for 160 children, Damba village. Section of the working project: power supply and electric lighting |
2010 |
8 |
Caspiy Engineering LLP |
Kindergarten for 160 children, Makat settlement Section of the working project: power supply and lighting |
2010 |
9 |
KazTransOil-Servie JSC |
Design and survey work to strengthen the Keles river bed (shore protection) |
2010 |
10 |
Helios LLP |
Registration of land plots under the poles of overhead power lines and state registration |
2011 |
11 |
Sicim SpA Kazakhstan Atyrau Branch |
Registration of documentation and state registration of a rotational camp for 1000 places and production bases |
2011 |
12 |
VNIPI TyazhElectroProject OJSC |
Coordination, obtaining an opinion and passing the state examination for the project "Reconstruction of the emergency power supply system of the Atyrau PS" |
2011 |
13 |
Gyural LLP |
Detailed design of the flow meter installation |
2011 |
14 |
Caspian Oil System LLP |
Working draft of the fire alarm of the office-warehouse |
2011 |
15 |
Atyrau State University after Dosmukhambetov |
Development of design and estimate documentation for the construction of a 9-storey educational building- |
2012 |
16 |
West Branch of KazTransOil JSC |
Detailed design "Oil Pump Station Inder, Hydraulic fracturing replacement" |
2012 |
17 |
PriCaspian Petroleum Company LLP |
Equipment supply |
2012 |
18 |
Agip KCO Consortium |
Services for registration of real estate and land plots, the "Bolashak" plant in Karabatan, 2012 |
2012 |
19 |
InTransCom Design Institute of transport and communication LLP |
Expert services and the conclusion of an independent examination, obtaining a building permit in GASK |
2012 |
20 |
Golden Strike LLP |
As-built and working drawings for HVAC sections, obtaining expertise on the object Golden Strike Entertainment Complex |
2012 |
21 |
Dauletova’s Individual Enterprise |
Development of the AS section of the working project, preparation of an expert opinion on the RP section of the AS, obtaining permission for construction and installation work of a sculpture workshop |
2012 |
22 |
Atyrau Institute on Oil and Gas |
Drawing up design and estimate documentation Installation of SCS, integration remote educational buildings into one corporate network (correction) |
2012 |
23 |
KaR-Tel LLP |
PD for the facility telecommunications and communications building LLP KaR-Tel |
2012 |
24 |
StroiTechno Engineering Company LLP |
Engineering and geodetic surveys and design work on the object Telemechanization of objects Potential Oil LLP |
2012 |
25 |
PSA Tendik LLP |
Working Design Project on Reconstruction of the PSA-Tendyk LLP oil base in Atyrau |
2012 |
26 |
Sicim SpA Kazakhstan |
RP Dormitory for management and dormitory for the staff of the Sichim branch |
2012 |
27 |
StarStroi JSC |
Electricity design work |
2012 |
28 |
Business Office LLP |
Development of a working project "Reconstruction of a hotel building into an office" |
2012 |
Registration of documents for the commissioning of the above building |
2013 |
||
29 |
KaR-Tel LLP |
Development of PD EIA (ecology) for the facility telecommunications and communications building KaR-Tel LLP |
2012 |
30 |
REK Makhambet LLP |
Engineering surveys at the Wagon depot facility for the repair of railway tanks and gondola cars with a point for internal and external car wash and car sludge yard at Makhambet station |
2012 |
31 |
Inter-Cargo Systems LLP |
Services for the development of design and estimate documentation and execution of all necessary documents for the "Oil Base" |
2012 |
32 |
Mercado LLP |
Development of the draft design "Sauna of the elite class" |
2012 |
33 |
Mercado LLP |
Development of a draft design "3-storey office building" |
2012 |
34 |
Midas Story Group LLP |
Development of the HVAC section for the hotel building |
2012 |
35 |
Caspian Ecology LLP |
Development of a detailed design "Construction and operation of a waste management complex |
2012 |
36 |
Caspian Ecology LLP |
Comprehensive engineering surveys of the industrial waste landfill in the Makhambet district of the Atyrau region. |
2012 |
37 |
Eco-Technic LLP |
Development of the working project "Expansion of the equipped site for the neutralization and utilization of industrial waste of Eko-Teknix LLP in the Zhyloi district of the Atyrau region |
2012 |
38 |
Guriev Trade House Individual Entrepreneur |
Adjustment of the RP section of the AU and the passage of the construction expertise of the administrative building in the city of Atyrau st. Datova 15 |
2012 |
39 |
Dzhumagaliyev Individual Entrepreneur |
Development of the sections "Electricity supply" and "Gas supply" for the "Greenhouse" object at the address Atyrau, Kenuzeksky rural district, area of the left drag |
2012 |
40 |
REK Makhambet LLP |
Obtaining permission for construction and installation work in the Office of the State Architectural and Construction Control in the Atyrau region. on the object Wagon depot for the repair of railway tanks and gondola cars with a point for internal and external car wash and car sludge yard at Makhambet station |
2012 |
41 |
StarStroi JSC |
Working Design Building of the Administrative Household Complex on the basis of Atyrau AF LLC Starstroy |
2012 |
42 |
Sicim SpA Kazakhstan |
Working Designing and registration of docks for commissioning an object into operation |
2012 |
43 |
PSA Tendik LLP |
Engineering surveys at the site of PSA-Tendyk LLP |
2012 |
44 |
PSA Tendik LLP |
Authorship supervision of the construction of the facility Reconstruction of the tank farm PSA-Tendyk LLP in Atyrau |
2012 |
45 |
Eco-Technics LLP |
Working Design Complex for waste management of Eco-Technics LLP in Munaylinsky district of Mangistau region |
2012 |
46 |
KaR-Tel LLP |
Authorship supervision of the building 2nd floor. Annexes to the 2-storey block in Atyrau, st. Dosmukhamedova 96b |
2012 |
47 |
KazTransGas Aimak JSC |
Design and estimate documentation for construction work for the construction of an industrial building |
2012 |
48 |
Dzhumagaliyev Individual Entrepreneur |
Sections of the Project "Electricity and gas supply", 2013 |
2013 |
49 |
InterGas Central Asian JSC |
Development of design and estimate documentation for the construction of an administrative and amenity complex in Aktau, 2013. |
2013 |
50 |
Business Office LLP |
Procurement, supply and installation of equipment |
2013 |
51 |
Business Office LLP |
Draft design of a 4-storey office building with interior design of the main premises of the facility of the Republic of Kazakhstan, Atyrau, st. Kulmanova 131A |
2013 |
52 |
Eco-Technics LLP |
Author's supervision over the construction of the facility "Waste management complex of LLP" Eco-technics ", located in the Munaylinsky district of the Mangistau region |
2013 |
53 |
Moldaniyaz Individual Entrepreneur |
Design of external power supply in the office of category III located at: Atyrau, st. Bigildinova |
2013 |
54 |
EmbaMunaiGas JSC |
Survey work on topogeodetic and geological surveys for the development of design and estimate documentation for the facilities of Embamunaigas JSC |
2013 |
55 |
ElJin Construction Co Ltd branch |
Performing the following services: 1. Project of site fencing 2. Plan of earth masses 3. Development of a reclamation project (technical report with the approval of the land committee) 4. Topographic survey at a scale of 1: 1000 5. Expertise on industrial safety for the land plot 6. Development of the environmental protection section with the approval of the environmental authorities for the reclamation project\ |
2013 |
56 |
Express Complect Supply LLP |
Development of a draft design for a mosque building (Masjid Design) |
15 май 13 |
57 |
Sinopec Engineering (Group) Co, Ltd Kazakhstani branch |
Registration of office buildings and facilities |
2013 |
58 |
Yars and Co LLP |
supply of shut-off valves Havle |
2013 |
59 |
ElJin Construction Co Ltd branch |
Registration of I&G CASPIAN GROUP LLP in the justice authorities of the Atyrau region |
2013 |
60 |
Atyrau Prof Geodesia LLP |
unification of 2 land plots, obtaining a state certificate for a redevelopment project, an expert opinion on a redevelopment project, a decision on redevelopment, AIP, acceptance into operation. Object, evaluation of an independent examination, obtaining an updated address reference for the object: Production base Kabdolova str. 16, 14a |
2013 |
61 |
Tengizchevroil LLP |
Material Supply |
2013 |
62 |
Tengizchevroil LLP |
Material Supply |
2013 |
63 |
StarStroi JSC |
Field topographic and geodetic works on the land plot for construction: The building of the administrative household complex on the basis of AF LLC Starstroy |
2013 |
64 |
Atyrau Refinery JSC |
Development and approval of the Emergency Response Plan at the filling station of the transport department of "Atyrau Refinery" LLP |
2013 |
65 |
Tengizchevroil LLP |
Material Supply |
2013 |
66 |
Sinooil LLP |
Development of a draft design "Reconstruction of a car wash building with redevelopment into an office building" |
2013 |
67 |
Sinooil LLP |
Development of a draft design "Construction of a gas station (Kurmangazinsky district)" |
2013 |
68 |
Sinooil LLP |
Development of a draft design "Construction of a gas station. Mkr. Sarkamys" |
2013 |
69 |
Sinooil LLP |
Development of a draft design "Construction of a gas station. Beibarys avenue" |
2013 |
70 |
KazTransGas Aimak JSC |
Development of design and estimate documentation for the reconstruction of the basement of the administrative building in the microdistrict. Almagul building 3 |
2013 |
71 |
KazTransGas Aimak JSC |
development of design and estimate documentation for the construction of a repair shop and closed boxes for car parking |
2013 |
72 |
KazTransGas Aimak JSC |
Binding of the project for the construction of office buildings of district operational sites in district centers with. Miyaly, s. Ganyushkino |
2013 |
73 |
Company Montazhspetsstroy JSC |
Development of the project "Prombaza JSC Company Montazhspetsstroy" (Industrial Base) |
2013 |
74 |
Caspian Projects Supply Co-Development LLP |
Development of a land management project for a land plot with a total area of 10.44 hectares (Atyrau, television center area. Victory Park) |
2013 |
75 |
Ariadna LLP |
Reconstruction of the existing built-in-attached dining room for 500 seats in a 72-apartment hostel of the hotel type into a dining room for 750 seats (1st stage) and 500 settlements. places (2nd stage) |
2013 |
76 |
StarStroil JSC |
Authorship Supervision for the construction of the facility The building of the administrative amenity complex on the basis of Atyrau AF LLC Starstroy in the Makhambet district |
2013 |
77 |
MontazhSpecStroi Company JSC |
Technical supervision of the construction of "Industrial base of JSC MCC Company" in the Kyzylkoginsky district of the Atyrau region |
2013 |
78 |
MontazhSpecStroi Company JSC |
Designer's supervision over the construction of "Industrial base JSC MCC Company" in the Kyzylkoginsky district of the Atyrau region |
2013 |
79 |
Kozhan LLP |
Development of the project "Construction of a rotational camp at the Morskoye field" |
2013 |
80 |
KazTransGas Aimak JSC |
Development of design and estimate documentation "Construction of an administrative building on the territory of the production base of the Atyrau industrial branch of KazTransGas Aimak JSC in the village of Balykshi" |
2013 |
81 |
KazTransGas Aimak JSC |
Development of design and estimate documentation "Loopback of high pressure gas pipelines on the right bank and left bank of the city of Atyrau" |
2013 |
82 |
Caspian Projects Supply Co-Development LLP |
Drawing up a technical report on the establishment of boundaries on the ground and the establishment of boundaries on the ground, the implementation of land construction work on a land plot for the construction and operation of a hotel residential complex, with a total area of 10.44 hectares, located in the telecentre area of Atyrau |
2013 |
83 |
Atyrau RemStroiMontazh LLP |
Designer's supervision over the construction of the object "Replacement of Gas Distribution Unit. Inder oil pumping station" |
2013 |
84 |
State Institution "Construction Department of Atyrau Region |
Development of design and estimate documentation for the construction of a tennis center in Atyrau |
2013 |
85 |
AtyrauKolik-Kurylys LLP |
Development of a land management project for a land plot for the construction of a service water pipeline from the city of Kulsary to Tengiz to the site of the GSU (gas separation plant) |
2013 |
86 |
Kozhan LLP |
Construction project of a site for drilling well No. 23 at the Morskoye field |
2013 |
87 |
Tengizchevrol LLP |
Material Supply |
2013 |
88 |
ЧПП (Kazakhstan) LLP |
Design and Exploration Works "Increasing the capacity of the Kazakhstan-China main gas pipeline (first section)" |
2013 |
89 |
IlJin Construction Co, Ltd branch |
Services: 1. project of site fencing 2. Plan of earth masses 3. Development of a reclamation project (technical report with agreement in the management of technical relations) 4. topographic survey at a scale of 1: 1000 5. Expertise on industrial safety on a land plot 6. Environmental protection section with approval by the environmental authorities for a reclamation project. |
2013 |
90 |
Tengizchevroil LLP |
1T-602 sulfur tank modernization project |
2013 |
91 |
AtyrauKolik-Kurylys LLP |
Adjustment of the WP "Site of the Gas Separation Unit. Site fencing design and plan of earth masses" |
2013 |
92 |
Beles Aktau LLP |
Development of the RP "Design of a quay complex with a crane-beam, a slip with a hangar above it for safe parking and maintenance, storage of ships and boats of the military unit, 2201" G "of the border service of the National Security Committee of the Republic of Kazakhstan, Damba square, Atyrau" |
2013 |
93 |
Zhiger Peasant Farm |
Design and estimate documentation for the construction of an egg poultry farm for 100 thousand chickens in the area of 8 km of the Atyrau-Uralsk highway, Makhambet district |
2013 |
94 |
Zhiger Peasant Farm |
Design and estimate documentation for the construction of an access road and external engineering networks of an egg poultry farm for 100 thousand chickens in the area of 8 km of the Atyrau-Uralsk highway, Makhambet district |
2013 |
95 |
Ariadna LLP |
Construction of a temporary storage facility for the early stage of work - Stage 1 Warehouses and free-standing container-type offices in Atyrau region, Tengiz field |
2013 |
96 |
Sicim SpA Kazakstan |
Design and survey work and commissioning services for the facility "Expansion of the residential complex with office premises" Sichim rotational village "on the territory of the Tengiz rotational village |
2014 |
97 |
Oil Transport Corporation LLP |
Development of design and estimate documentation "Hangar building 75 m" |
2014 |
98 |
Tengizchevroil LLP |
Supply of materials |
2014 |
99 |
Tengizchevroil LLP |
Supply of materials |
2014 |
100 |
Atyrau Oil Refinery LLP |
Construction of a cooling tower at the wastewater treatment plant of the UZK shop No. 5 of the Atyrau Refinery |
2014 |
101 |
Kozhan LLP |
Construction project for the site of well No. 19 with an access road to the Morskoye field |
2014 |
102 |
Atyrau Refinery LLP |
Reconstruction of the plant Mechanical treatment facilities of workshop No. 8 of Atyrau Refinery |
2014 |
103 |
Helios LLP |
External power supply of filling station 17 "Elevatornaya" |
2014 |
104 |
Atyrau Tengiz Construction Company LLP |
Development of the TCO Training Center project |
2014 |
105 |
Supply Atyrau Logistics LLP |
Work on the development of design and estimate documentation for the object: "Construction of warehouses in Atyrau" |
2014 |
106 |
KazMunaiGas Products LLP |
Design and survey work, development of design and estimate documentation for gas stations in Aktobe and Zhambyl regions |
2014 |
107 |
Sukishev IE |
Development of a detailed design for the construction of a store and service station st. Amandosova 51 with the receipt of an independent expert opinion and permission for construction and installation works |
2014 |
108 |
BonaFideService LLP |
Engineering-geological and engineering-geodetic surveys for the object: "Main fiber-optic communication line in the Atyrau-Ganyushkino section to the State border of the Republic of Kazakhstan in the direction of the" Aksaraiskaya "station |
2014 |
109 |
Tengizchevroil LLP |
Material supply |
2014 |
110 |
Tengizchevroil LLP |
Material Supply |
2014 |
111 |
KazTransOil LLP |
Design and survey work "Fire and security alarm system of station auxiliary facilities: OPS Bolshoi Chagan, SPN Baranovka" |
2014 |
112 |
Sicm Spa Kazakhstan branch |
Development of a detailed design, approval and commissioning of a new section of the "Sichim" rotational camp in Tengiz |
2014 |
113 |
Sicm Spa Kazakhstan |
Development of a draft design for an office building located on a land plot at the address: Atyrau, Satpayev st., Nurbank district |
2014 |
114 |
SinoOil LLP |
Services for the performance of engineering and geological surveys of a land plot located in the city of Atyrau (in the Khimposelka area, the Ontustik industrial zone, st-e No. 59) |
2014 |
115 |
Khazar Trade LLP |
Access road design services |
2014 |
116 |
OzenMunaiGas JSC |
Production monitoring (geodynamic monitoring of deposits) |
2014 |
117 |
KazTransOil JSC |
Dismantling of the second string of the Uzen-Atyrau-Samara oil pipeline 1138.5-1138.85 DN 700 mm (underwater crossing) 0.35 km |
2014 |
118 |
Sicm Spa Kazakhstan branch |
Registration with the justice authorities of the Zhyloi district of the Atyrau region of the production base located at the address: Atyrau region, Zhyloi district, Tengiz rotational village, 3rd quarter |
2014 |
119 |
KazTransOil JSC |
Engineering and geological surveys for PSB ZF projects |
2014 |
120 |
Emir Oil LLP |
System of collection, treatment and transportation of oil and gas at the field LLP "Emir-Oil" |
2014 |
121 |
State Institution Atyrau Regional Internal Affairs Department of the Ministry of Internal Affairs of the Republic of Kazakhstan" |
1. Overhaul of the sports complex Dynamo DVD 2. Overhaul of boxes and administrative building of ATX DVD 3. Overhaul of precinct police stations No. 1,3,4,7,10,11,12,13 4. Overhaul of the administrative building of the Department of Internal Affairs of the Atyrau region 5. Overhaul of the administrative building of the Internal Affairs Directorate of the Atyrau region |
2014 |
122 |
State Institution "Construction Department of Atyrau Region" |
Development of design and estimate documentation for the construction of a field for big football and athletics in Atyrau |
2014 |
123 |
Tengizchevroil LLP |
Engineering work outside the area of activity for the development of a project to connect the container laboratory to existing utility networks |
2014 |
124 |
EmbaMunaiGas JSC |
Design and survey work on the object: "Construction of gas supply lines for the buildings of the electrical shop of the ESR" Zhaik "at the oil and gas production department" Zhaikmunaigas " ) " |
2014 |
125 |
NIPI CaspiMunaiGas JSC |
Development of working documentation for the TCO project "Installation of new pig chambers, manifold of TGVD" |
2014 |
126 |
ABTM LLP |
Geodetic alignment works at construction sites of the facility "Loopback of high pressure gas pipelines on the right bank and left bank of Atyrau" |
2014 |
127 |
TESS Project |
Development of design estimates for the construction of engineering and communication infrastructures in the village of Ganyushkino |
2014 |
128 |
KulsaryGas LLP |
Adupting Updating the project for the construction of a secondary school for 300 students in the city of Kulsary. |
2014 |
129 |
InterGas Central Asia JSC |
Development of design and estimate documentation: construction of a interine GRS-1 DN 530mm between the GDS-1 hot-water outlet in Atyrau for 119 km "MSK" 4 and the GDS outlet "Finskaya" for 131 km MGS |
2014 |
130 |
CROWNWAY TRADE LLP |
Material supply |
2014 |
131 |
Sinooil LLP |
Topographic survey at a scale of 1: 500 and engineering and geological surveys for design for the object: "Construction of a" Sinooil "automobile filling station" |
2014 |
132 |
weldTech LLP |
Goods delivery |
2014 |
133 |
АК Ниет AkNiyet LLP |
For the provision of services for geodetic support of the object "Construction of engineering and communication infrastructure in the city of Atyrau (Aksai village) (water supply) |
2014 |
134 |
АК Ниет AqNiyet LLP |
Development of design and estimate documentation for the construction of 5 pedestrian crossings in Atyrau |
2014 |
135 |
NefteStroiService LLP |
Development of design and estimate documentation for the construction of a concrete plant with a capacity of 200m3 / hour, with the approval of the working project in the state bodies of the Republic of Kazakhstan, obtaining a positive conclusion. state expertise, author supervision |
2014 |
136 |
Construction Department of Kumangazy districst |
Development of design and estimate documentation for "Construction of pedestrian bridges from metal structures across the Koneu rivers in the Kurmangazinsky district of the Atyrau region" |
2014 |
137 |
Construction Department of Kumangazy districst |
"Development of design and estimate documentation for" Construction of pedestrian bridges from metal structures across the Yagodnoye rivers in the Kurmangazinsky district of the Atyrau region " |
2014 |
138 |
Construction Department of Kumangazy districst |
"Development of design and estimate documentation for" Construction of pedestrian bridges from metal structures across the Tukhoye rivers in the Kurmangazinsky district of the Atyrau region " |
2014 |
139 |
TengizChevroil LLP |
Engineering design for project No. X-600-008-14, "Modernization of air chambers for installations 3 & 4 for corrosion protection" |
2014 |
140 |
Peasant Farm Felix |
Development of design estimates for the production, processing and canning of vegetables |
2014 |
141 |
Dongil Consruction CO. LTD |
Topographic survey of the territory of the ABK JSC "EmbaMunayGas" with a total area of 1.23 hectares, located at the address: Atyrau, Valikhanov street 1 |
2015 |
142 |
BatysAlianceStroi LLP |
Stakeout of the main construction lines, coordination of two benchmarks, draw up a breakdown report |
2015 |
143 |
State Institution "Aktau City Construction Department" |
Development of design and estimate documentation for the construction of the Khazar SubStation-110/6 kV gas transmission station |
2015 |
144 |
State Institution "City Department of Housing and Communal Services" |
development of design estimates for capital repairs of residential buildings " |
2015 |
145 |
State Institution "City Department of Housing and Communal Services" |
development of design estimates for capital repairs of residential buildings " |
2015 |
146 |
State Institution " Atyrau Regional Internal Affairs Department of the Ministry of Internal Affairs of the Republic of Kazakhstan" |
Authorship supervision over the overhaul of the 1) "Sports Complex, 2)Garage Boxes and administrative building, 3)Precinct police stations, 4) Administrative building of the Department of Internal Affairs, 5) Administrative building of the Department of Internal Affairs |
2015 |
147 |
Caspian Institute of Exploration Geophysics JSC LLP |
execution of engineering and geodetic surveys for the development of working documentation "Objects of transport infrastructure" for the project "Complex of deep oil refining at the Atyrau refinery. |
2015 |
148 |
State Institution "Construction Department of Atyrau Region" |
provision of architectural supervision services for the object: "Construction of a tennis center in the city of Atyrau" |
2015 |
149 |
Trans Oil Terminal LLP |
Development of a working project "Construction of a boiler house at Oil Terminal Zhamansor" and its approval with regulatory authorities, carrying out and obtaining: 1. Independent expertizing; 2. Technical supervision for the construction period; 3. Building permits in GASK; 4. Act of the acceptance commission into operation; 5. Registration in the bodies of Justice of the act of commissioning; |
2015 |
150 |
DorceKazak Construction and Prefabricated Building Industry Co, LTD |
Adaptation of design documentation in accordance with the norms and standards of the Republic of Kazakhstan, with obtaining approvals for design documentation in the authorized bodies of the Republic of Kazakhstan, obtaining a positive conclusion of the state examination, as well as receiving an approving Notification of the beginning of construction and installation work. |
2015 |
151 |
"Aktau city department of passenger transport and highways" |
Development of design and estimate documentation for the construction of overground pedestrian crossings in the city of Aktau |
2015 |
152 |
KKS-Sicim LLP |
Development of a detailed design, approval and commissioning at a new site of the Sichim rotational village on Tengiz (new part), with approval of the working design in the authorized bodies of the Republic of Kazakhstan, obtaining a positive opinion of an independent examination, designer and technical supervision " |
2015 |
153 |
Atyrau Trans Gas LLP |
Design and survey work on the object: Expansion (reconstruction) of the existing railway tracks to a section of 9.43 hectares with the approval of the working project in the authorized bodies of the Republic of Kazakhstan |
2016 |
154 |
Atakent Customs Services LLP |
Engineering and geodetic surveys and development of a draft design for the object "5-storey building with a restaurant" |
2016 |
155 |
EmbaMunaiGas JSC |
PIR - Engineering and geodetic surveys . Construction of a protective dam on the Northwest wing of S. Nurzhanov field |
2016 |
156 |
City Construction Department " |
Development of design and estimate documentation for the construction of a solid waste landfill |
2016 |
157 |
Kurmangazy District Department of Housing and Communal Services, Passenger Transport and Highways of Atyrau Region " |
Development of design and estimate documentation for the reconstruction of an access and intra-village road to the village of Tengiz, with sidewalks |
2016 |
158 |
Kurmangazy District Department of Housing and Communal Services, Passenger Transport and Highways of Atyrau Region " |
Development of design and estimate documentation for the reconstruction of an access and intra-village road to the village of Kotyayevka, with sidewalks |
2016 |
159 |
Kurmangazy District Department of Housing and Communal Services, Passenger Transport and Highways of Atyrau Region " |
Development of design and estimate documentation for the reconstruction of an access and intra-village road to the village of Aqkol, with sidewalks |
2016 |
160 |
Kurmangazy District Department of Housing and Communal Services, Passenger Transport and Highways of Atyrau Region " |
Development of design and estimate documentation for the reconstruction of access and intra-village highways in the village of Mukyr, Kyzylkoginsky district |
2016 |
161 |
Department of Architecture and Urban Planning of Atyrausk. Region " |
Development of a simplified general plan combined with a detailed planning project for the village of Alipov, Kurmangazy district, Atyrau region. |
2016 |
162 |
MontazhSpecStroi Company JSC |
design "Rotational village on the Tengiz field" |
2016 |
163 |
MontazhSpecStroi Company JSC |
geotechnical works on the object "Construction rotational camp in Tengiz settlement" |
2016 |
164 |
Kurmangazy District Construction Department " |
designer supervision services for the object: "Construction of engineering and communication infrastructures in the village of Ganyushkino, Kurmangazinsky district" |
2016 |
165 |
Zhuma-Sana LLP |
Author's supervision over the construction of the facility: "Construction of a kindergarten for 290 children in Yerkinkala, Atyrau" |
2016 |
166 |
Kurmangazy District Construction Department " |
Rendering of architectural supervision services for the object: "Construction of pedestrian bridges of their metal structures across the Koneu River in the Kurmangazinsky district of the Atyrau region" |
2016 |
167 |
Kurmangazy District Construction Department " |
Rendering of architectural supervision services for the object: "Construction of pedestrian bridges and their metal structures across the Tukhloe River in Kurmangazy District of Atyrau Region" |
2016 |
168 |
Kurmangazy District Construction Department " |
Rendering of architectural supervision services for the object: "Construction of pedestrian bridges and their metal structures across the Yagodnoye River in the Kurmangazinsky district of the Atyrau region" |
2016 |
169 |
Tengizchevroil LLP |
Generator supply |
2016 |
170 |
DorceKazak Construction and Prefabricated Building Industry Co, LTD |
Adaptation of design documentation developed by DorceKazak Construction and Prefabricated Building Industry Co, LTD DorceKazak Construction and Prefabricated Building Industry Co, LTD (Turkey) to the requirements of the legislation of the Republic of Kazakhstan in the field of architecture, urban planning and construction activities (construction standards, norms, rules, etc. ) as well as to local conditions |
2016 |
171 |
Sicim SpA Kazkahstan branch |
Design and estimate documentation for the object "Development of a working design with approval from the authorized bodies of the Republic of Kazakhstan, at a new site of the Sichim rotational village on Tengiz (production base)" |
2016 |
172 |
Sicim SpA Kazkahstan branch |
development of the working project "Temporary shift camp for 1250 people" |
2016 |
173 |
Sicim SpA Kazkahstan branch |
development of the working project "Temporary concrete plant Sicim on the Prorva Oilfield" |
2016 |
174 |
Sicim SpA Kazkahstan branch |
working project "Temporary industrial base Sicim on Prorva" |
2016 |
175 |
Sicim SpA Kazkahstan branch |
Development of the foundation for an 8-ton tower crane " |
2016 |
176 |
Guriev Trade House IE |
Development of a detailed design of a 5-storey office building at S. Datova st., 15 B "\ |
2016 |
177 |
Access and Coating Group LLP |
"Access and Coating Group"working project "3-storey hostel |
2016 |
178 |
DKZ Construction and prefabricated Building Industry LLP |
Designer's supervision over the construction of the facility "Construction and operation of House 6" of the Shanyrak (ESS) shift camp " |
2016 |
179 |
Kurmangazy District Construction Department " |
Architectural supervision services for the object "Overhaul of the improvement of the central square in the village of Ganyushkino" |
2016 |
180 |
Kurmangazy District Construction Department " |
Development of design estimates "Construction of engineering and communication infrastructures in the village Ganyushkino |
2016 |
181 |
Kurmangazy District Construction Department " |
Development of design estimates documentation for the reconstruction of water treatment facilities |
2016 |
182 |
State utility company "Kigach village club" GU "Department of internal policy, culture and language development of Kurmangazin district of Atyrau region" |
Works on the project Reconstruction of the Club, |
2017 |
183 |
City Construction Department " |
Author's supervision of the object: "Construction of a field for big football and athletics in Atyrau" |
2017 |
184 |
Ak-Kamys Invest LLP |
Provision of R&D and field supervision services for the facility "Rotational village" Ak Kamys-Invest "for 3000 places" |
2017 |
185 |
Ak-Kamys Invest LLP |
preliminary design for the object: "Rotational camp for 3000 places" |
2017 |
186 |
Tengzchevroil LLP |
Technical control of commissioning of a diesel generator set |
2017 |
187 |
MontazhSpecStroi Company LLP |
Engineering-geological and engineering-geodetic surveys, including work on electrometry on connection objects, a power supply line of overhead lines, 6 km long, and gas supply, 2.5 km long, from the connection points to the "Builder's rotational camp" |
2017 |
188 |
MontazhSpecStroi Company LLP |
field supervision at the "Builder's rotational camp" |
2017 |
189 |
Atyrau Refinery LLP |
architectural supervision of construction at the facility: "Construction of a cooling tower at the wastewater treatment plant of the ultrasonic inspection of the PKiS workshop of the Atyrau refinery" |
2017 |
190 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for "Construction of a high-pressure connecting gas pipeline from AGDS" Gazprommash-50 "" Orbita "to GDS No. 1" Atyrau " |
2017 |
191 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for "Construction of the connecting gas pipeline of the AGDS" Aqkol "- p. Dashino " |
2017 |
192 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for “Construction of a high-pressure inter-settlement gas pipeline from Zhylandy village - from. D. Nurpeisov " |
2017 |
193 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for "Construction of a high-pressure connecting gas pipeline with. with crossing Ural river |
2017 |
194 |
City Construction Department " |
Correction of design and estimate documentation for the construction of 5 pedestrian crossings in the city of Atyrau (Azattyk avenue, the area of the Tax Department Building |
2017 |
195 |
City Construction Department " |
Correction of design and estimate documentation for the construction of 5 pedestrian crossings in Atyrau (Makhambet Street, the area of the bus stop "Svetlana") |
2017 |
196 |
City Construction Department " |
Correction of design and estimate documentation for the construction of 5 pedestrian crossings in Atyrau (Street Baimukhanov, railway station area) |
2017 |
197 |
City Construction Department " |
Correction of design and estimate documentation for the construction of 5 pedestrian crossings in Atyrau (Satpayev Street, at the intersection with Taimanov Avenue) |
2017 |
198 |
City Construction Department " |
Correction of design and estimate documentation for the construction of 5 pedestrian crossings in Atyrau (Satpayev Street, the area of the music academy. D. Nurpeisova) |
2017 |
199 |
Astol LLP |
Correction of the electronic version of the working drawings of the ECP |
2017 |
200 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for "Construction of gas pipelines in the settlements of Taskudyk, Sorkol, Sarkumak, Bylkyldakty, Konyrauly, section Kenbai of the Kyzylkuginsky district of the Atyrau region" \ |
2017 |
201 |
Department of Energy and Housing and Communal Services of Atyrau Region " |
Development of design and estimate documentation for "Construction of gas pipelines in the village of Amangeldy, Isatai district, Atyrau region" |
2017 |
202 |
Sicim SpA Kazkhstan branch |
Development of a draft design for the object: "Construction of a production base of the Sichim S.p.A Kazakhstan Branch in the Tengiz rotational village, with its approval in the authorized bodies of the Republic of Kazakhstan" |
2017 |
203 |
"ATB Group of companies" LLP |
Development of a draft design for the project "Residential complex in the city of Atyrau" |
2017 |
204 |
EmbaMunaiGas JSC |
Designer's supervision services for the object "Construction of a protective dam on the North-West wing of the S. Nurzhanov field" |
2017 |
205 |
Aktau city construction department " |
Designer's supervision services for the construction project "Construction of the Khazar 110 / 6kV Substation" |
2017 |
206 |
DiamantStroiPoject LLP |
Development of a draft design for the project "Construction of a hostel for 200 people" |
2017 |
207 |
"KOR-KAZ Group" LLP |
Development of a draft design for the facility "Rotational camp for 2000 places" |
2017 |
208 |
Construction Department of Atyrau region " |
Adjustment of design estimates for the construction of a central district hospital for 75 beds in the city of Kulsary |
2017 |
209 |
Construction Department of Atyrau region " |
Development of design and estimate documentation for the Construction of a school for 600 children with a boarding school for 300 children in the village of Makhambet |
2017 |
210 |
Department of Housing and Communal Services, Passenger Transport and Highways of the Kyzylkoginsky District " |
Development of design and estimate documentation "Construction of an airport in the village of Miyaly, Kyzylkogo region" |
2017 |
211 |
EmbaMunaiGas JSC |
Development of a draft, detailed design of the interior of the AUP office hall |
2017 |
212 |
Temirali Company LLP |
Development of design and estimate documentation for the object "Construction of an industrial base" at the Tengiz field, Tengiz rotational village |
2018 |
213 |
Caspian Expo LLP |
Development of a draft design for a residential complex in the city of Atyrau, microdistrict Samal |
2018 |
214 |
Zhaiyk Temir Service LLP |
Development of a draft design for the object "9-storey residential building in Atyrau" |
2018 |
215 |
Atyrau Su Arnasy (Atyrau Water Trunk Pipelines) |
Development of design and estimate documentation |
2018 |
216 |
Oil Le Roy LLP |
R&D and technical survey of the "Multifunctional complex" facility in the village of Ganyushkino |
2018 |
217 |
PSI ENERGY & CONTROL LLP |
Design and survey work on the project "Replacement of the TCOV substation" |
2018 |
218 |
Gaz Stroy montazh KZ LLP |
“Construction of the Kulsary-Tengiz trunk water pipeline (industrial water)”. |
2018 |
219 |
Gaz Stroy montazh KZ LLP |
Author's supervision services for the construction of the “Construction of the Kulsary-Tengiz water trunk pipeline (raw water)”. |
2018 |
220 |
Sicim SpA Kazkahstan branch |
Author's supervision over the construction of the facility "Construction of a rotational camp and production base in the town of Aksai, Burlinsky district of West Kazakhstan region" |
2018 |
221 |
ATCS LLP |
Engineering design for the project: "41-16 logistics office and 044-16 office for the TCO central warehouse" |
2018 |
222 |
Caspian Expo LLP |
Design and survey work on the object "Residential complex and engineering and communication infrastructure at the address: Atyrau, Samal microdistrict" |
2018 |
223 |
Temirali Company LLP |
Development of design and estimate documentation for the object "Construction of a process water pipeline" |
2018 |
224 |
Temirali Company LLP |
Design and survey work on the object "Canteen for 150 seats" |
2018 |
225 |
Temirali Company LLP |
Design and survey work on the object "Office Construction" in Tengiz Rotational Village for "Temirali Company" |
2018 |
226 |
Temirali Company LLP |
Design and survey work on the object "Construction of a hostel" in Tengiz Rotational Village for "Temirali Company" |
2018 |
227 |
Kurmangazy District Construction Department " |
«Development of design and estimate documentation for the Construction of a pedestrian bridge over the Buzausylan river in the village of Ganyushkino, Kurmagazinsky district" |
2018 |
228 |
Kurmangazy District Construction Department " |
"Development of design and estimate documentation for the Construction of a pedestrian bridge across the Sharon River between the settlements of Shortanbay-Zhylandy, Kurmagazin District" |
2018 |
229 |
Sicim SpA Kazkahstan branch |
Design and survey work for the "Temporary concrete batch plant" |
2018 |
230 |
Tengizchevroil LLP (TCO) |
Reconnection of the TCO LLP export gas pipeline to the CAC-4 Trunk GasSystem at the 597 km section |
2018 |
231 |
Temirali Company LLP |
Design and survey work on the object "Office Construction" in Atyrau |
2018 |
232 |
Timal Conctruction Group |
Arrangement of the "AIRANKOL" field |
2019 |
233 |
State Institution "Construction Department of Isatay district " |
"Development of design and estimate documentation for construction of standard cattle burial grounds in seven settlements Isatay district of Atyrau region " |
2019 |
234 |
TCO |
Development of a Working Package for the design of an electronic security system at Warehouse No. 7, the Balkans facility |
2019 |
235 |
Kurmangazy district department of housing and communal services, passenger transport and highways of the Atyrau region" |
Architectural supervision services for the object "reconstruction of an intra-village road in the village of Akkol with sidewalks in the Kurmagazinsky district of the Atyrau region" |
2019 |
236 |
Architectural supervision services for the construction project “Construction of gas pipelines in the village. Amangeldy, Isatai district, Atyrau region " |
2019 |
|
237 |
ATCS LLP |
Designer supervision: office 41-16 of the logistics office and office 44-16 for the central warehouse |
2019 |
238 |
Gaz Stroy montazh KZ LLP |
Designer's supervision "Construction of the Kulsary-Tengiz water pipeline" (industrial water) .2nd stage \ |
2019 |
239 |
Administration of passenger transport and highways of the Atyrau region " |
Construction of the northern bypass road of the city of Atyrau |
2019 |
240 |
EmbaMunaiGas JSC |
"Correction of design and estimate documentation of the object" Construction of a protective dam on the Northwest wing of the S. Nurzhanov field, Zhylyoi district, Atyrau region " |
2019 |
241 |
State Institution "Construction Department of Atyrau Region" |
Reconstruction of administrative buildings of Atyrau regional Police Department |
2019 |
242 |
Access and Coating Group ACG LLP |
Design and survey work on the project “Modernization of the production base of LLP“ Access and Coating Group ”. Construction of warehouse buildings and a one-story dormitory " |
2019 |
243 |
Sicim SpA |
Design and survey work on the object "Construction of a rotational camp and a production base in the town of Aksai, Burlinsky district of West Kazakhstan region" \ |
2019 |
244 |
Sicim SpA |
Design and survey work on the object "Modernization of the Sichim production base in the Tengiz rotational village" |
2019 |
245 |
Department of Energy and Housing and Communal Services of the Mangystau Region " |
Development of design and estimate documentation for "Construction of the Aktau-Kuryk-Zhetybai-Shetpe water pipeline, Mangistau region" |
2019 |
246 |
Zhaiyk Temir Service LLP |
Construction of a 9-storey residential building with parking and office premises on Auezov street in Atyrau |
2019 |
247 |
Aktau Development plaza |
Design of a 9-storey building in Aktau |
2019 |
248 |
Tengizchevroil LLP |
Implementation of field supervision over the construction of a central district hospital for 75 beds in the city of Kulsary, Zhyloi district of Atyrau region |
2020 |
249 |
Tengizchevroil LLP |
Gathering HP-LP Conversion Single Well Pads |
2020 |
250 |
Tengizchevroil LLP |
WRF NEW BUFFER BAGS INSTALLATION |
2020 |
251 |
JSC "National Company" Kazakhstan Temir Zholy " |
Development of design estimates for the overhaul of 13 reinforced concrete bridges |
2020 |
252 |
Tengizchevroil LLP |
Design_IB High pressure gas line replacement |
2020 |
253 |
Tengizchevroil LLP |
Разработка рабочего проекта для замены установки гипохлорита натрия (NaOCl) с учетом новой производительности КОСа/WTF sodium hypochlorite unit replacement |
2020 |
254 |
Tengizchevroil LLP |
Correction of design estimates for the project "CONSTRUCTION OF A CENTRAL DISTRICT HOSPITAL FOR 75 BEDS IN KULSARY CITY OF ZHYLYOISKY DISTRICT OF ATYRAU REGION " |
2020 |
255 |
MSI "Secondary School No. 2 named after Zhumeken Nazhimedenov" of the state institution "City Department of Education" |
Development of design estimates for capital repairs of buildings |
2020 |
256 |
KSU "Secondary school named after M. Lomonosov" of the state institution "City Department of Education" |
Development of design estimates for capital repairs of buildings |
2020 |
257 |
MSI "Secondary School No. 10 named after S. Mukanov" of the state institution "City Department of Education" |
Development of design estimates for capital repairs of buildings |
2020 |
258 |
State Institution "Construction Department" of Talgar region |
Construction of an extension for 300 children to secondary school No. 16 in the village of Ryskulov, Talgar district, Almaty region |
2020 |
259 |
RSU "Committee on Water Resources of the Ministry of Ecology, Geology and Natural Resources Republic of Kazakhstan" |
Development of design and estimate documentation "Construction of a reservoir on the Kumisketken section of the Syrdarya River for the accumulation of waters in the Shieli district of the Kyzylorda region" |
2020 |
260 |
Pavlodar EnergProject LLP |
"Development of design and estimate documentation for the construction of engineering and communication infrastructure in the Talgayran village of Atyrau city, a plot of 62 hectares (from the main network, on-site engineering networks, landscaping and landscaping) |
2020 |
261 |
Department of Construction, Architecture and Urban Planning "Birzhan Sal District |
Development of design and estimate documentation for the construction of utility and household sewerage system K1 with pumping stations and WWTP in the town of Stepnyak, Birzhan sal district, Akmola region |
2020 |
262 |
SI "Construction Department of Akimat of Kostanay City" |
Adjusting the working project Construction of a 4-section residential building No. 151 in the microdistrict. "Bereke" Kostanay " |
2020 |
263 |
SI "Construction Department of Akimat of Kostanay City" |
Adjusting the working project Construction of a 4-section residential building No. 159 in the microdistrict. "Bereke" Kostanay " |
2020 |
264 |
SI "Construction Department of Akimat of Kostanay City" |
Adjusting the working project Construction of a 4-section residential building No. 124 in the microdistrict. "Bereke" Kostanay " |
2020 |
265 |
SI "Construction Department of Akimat of Kostanay City" |
Adjusting the working project Construction of a 4-section residential building No. 126 in the microdistrict. "Bereke" Kostanay " |
2020 |
266 |
SI "Construction Department of Akimat of Kostanay City" |
2020 |
|
267 |
SI "Karakiyansky District Department of Construction, Architecture and Urban Planning" |
Development of design and estimate documentation for Reconstruction of an old school building in the village of Kulandy into the building of the House of Culture and a gym |
2020 |
268 |
State Institution "Management of Construction, Architecture and Urban Planning of the Mangistau Region" |
"Construction of a water supply system for sea and distilled water of subzones No. 2, No. 4 of the SEZ" Seaport Aktau " |
2020 |
269 |
Grand-Master LLP |
Correction of the working project "Construction of a power supply line in new micro-districts" Merey "in the village of Makhambet and in the village of Zhalgansai. Makhambet district, Atyrau region" |
2020 |
270 |
State Institution "Construction Department of Makhambet District" |
Correction of the working project "Construction of a power supply line in new micro-districts" Merey "in the village of Makhambet and in the village of Zhalgansai. Makhambet district, Atyrau region" |
2020 |
271 |
JSC "Station Ekibastuz GRES-2" (hydro power station) |
"Development of a construction / reconstruction project" Strengthening of metal structures and reconstruction of a belt conveyor LK 1 AB, LK 7/1 " |
2020 |
272 |
Trunk Pipeline LLP |
"Implementation of SCADA at the facilities of" Magistralny Vodovod "LLP (Trunk Pipeline) |
2020 |
273 |
Trunk Pipeline LLP |
Air crossing of the Astrakhan-Mangyshlak pipeline across the river. Manasha. |
2020 |
274 |
Kaza Zhanbas Munai JSC |
"Expansion of the steam injection system with the movement of three mobile steam generating units (MPGU) of the YZG-18-12G brand at the Karazhanbas field" |
2020 |
275 |
KEGOC JSC (Power Generation and Distribution Company) |
"Reconstruction of the 500 kV substation" Nura "with the installation of an autotransformer group 3x167 MVA" |
2020 |
276 |
JSC "NC" KazMunayGas " |
Correction of design and estimate documentation "Equipping the administrative building of JSC NC" KazMunay Gas "with additional individual fire rescue devices" |
2020 |
277 |
JSC "NC" KazMunayGas " |
Development of design and estimate documentation for "Backup power supply networks of the administrative building Emerald Quarter, block B". |
2020 |
278 |
Reliable Sail LLP |
Design and estimate documentation Construction of a leisure center Samal |
2020 |
279 |
Aktobe production branch of KazTransGasAimak JSC |
Modernization of gas distribution networks in the GMZ area in Aktobe (phase 1, phase 2) |
2021 |
280 |
Aktobe production branch of KazTransGasAimak JSC |
Modernization of the high-pressure gas pipeline of the 1st category GDS-2-TPP in Aktobe |
2021 |
281 |
Aktobe production branch of KazTransGasAimak JSC |
Re-laying of the underground gas pipeline AGDS Akzhar to Shubarkuduk settlement from Zhaksymai settlement to polyethylene with replacement of hydraulic fracturing unit No. 1 with a gas-operated gas unit in Shubarkuduk settlement, Temir district (stage 1) |
2021 |
282 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of GRPSh-29 with GRPSh-15-1N-U1 with the removal of Centralnaya st., Kyzylzhar village (gas distribution cabinets) |
2021 |
283 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of GRPSh-19 with GRPSh-13-1-U1 in Georgievka settlement |
2021 |
284 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of hydraulic fracturing unit No. 33 with a gas-operated unit with a change in the location and relocation of an underground medium-pressure gas pipeline to the shopping and entertainment center "Keruen-City" in Aktobe (1st start-up complex) |
2021 |
285 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of Gas Distribution unit No. 7 with PGB-15-2N-U1, Pionerny settlement, Kandyagash, Mugalzhar region |
2021 |
286 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of GRPSh-18 with GRPSh-13-1-U1 in Georgievka settlement |
2021 |
287 |
Aktobe production branch of KazTransGasAimak JSC |
Loopback of the gas pipeline of the residential area on the street. Turgenev with the installation of the PGB and with the replacement of the ShP-67 with the GRPSh-15-1N-U1 in the city of Aktobe |
2021 |
288 |
Aktobe production branch of KazTransGasAimak JSC |
Replacement of Gas Distribution Unit - 7 with PGB-15-2NV-U1, Don settlement, Khromtau |
2021 |
289 |
State Institution "Construction Department of Atyrau" |
Development of design and estimate documentation for the construction of engineering and communication infrastructure for settlements and microdistricts, the city of Atyrau |
2021 |
290 |
State Institution "Department of Housing and Communal Services, Passenger Transport and Highways of the Akimat of Kostanay City" |
Reconstruction of Boiler Room No. 10 with the installation of a gas consuming installations for covering own needs in Kostanay |
2021 |
291 |
State Institution "Department of Housing and Communal Services, Passenger Transport and Highways of the Akimat of Kostanay City" |
Reconstruction of Boiler Room No. 11 with the installation of a gas consuming installations for covering own needs in Kostanay |
2021 |
292 |
State Institution "Department of Housing and Communal Services, Passenger Transport and Highways of the Akimat of Kostanay City" |
Reconstruction of Boiler Room No. 12 with the installation of a gas consuming installations for covering own needs in Kostanay |
2021 |
293 |
State Institution "Department of Housing and Communal Services, Passenger Transport and Highways of the Akimat of Kostanay City" |
Development of design estimates "Construction of a steam boiler house on an alternative fuel (pellets) in Kostanay" |
2021 |
294 |
Karagandy Su LLP (Water Distribution Company) |
Systems for water disinfection with sodium hypochlorite (electrolysis method) for the Cleaning Complex of SViO LLP "Karagandy Su" |
2021 |
295 |
Department of construction of the city of Kokshetau |
Development of design estimates for the reconstruction of the distribution system of the slurry pipelines of the ash dump bowl and enlarging the body of the dam of the ash dump bowl in Kokshetau |
2021 |
296 |
Kazatomprom - SaUran LLP |
Mynkuduk uranium deposit development project (Vostochny site)" |
2021 |
297 |
"Karakiya district department of construction, architecture and urban planning" |
"Reconstruction of an old school building in the village of Kulandy into a building of a cultural center and a gymnasium" |
2021 |